Aileen Selent

Revision Site Development Plan: Preliminary draft of the plan and draft scope for the environmental assessment published

  • General

The Federal Maritime and Hydrographic Agency (BSH) is initiating the process to update and revise the existing Site Development Plan (Flächenentwicklungsplan, FEP 2025). BSH has published a preliminary draft and the draft scope for the strategic environmental assessment. The preliminary draft outlines a path to… Read More »Revision Site Development Plan: Preliminary draft of the plan and draft scope for the environmental assessment published

Publication of the correction to the 2nd update of the “Standard Design”

  • General

In March 2026, the Federal Maritime and Hydrographic Agency (BSH) published the 2nd update of the “Standard Design” – Minimum requirements concerning the constructive design of offshore structures within the Exclusive Economic Zone (EEZ). In the meantime, Annex 9 has been finalised. This annex incorporates… Read More »Publication of the correction to the 2nd update of the “Standard Design”

BSH publishes draft for the preparation of an infrastructure area plan

  • General

The BSH may designate routes, route corridors and platform locations for offshore grid connections – which are first designated in the site development plan (Flächenentwicklungsplan, FEP) – as infrastructure areas in accordance with Section 12j(1), sentences 1 and 2, of the Energy Industry Act (Energiewirtschaftsgesetz,… Read More »BSH publishes draft for the preparation of an infrastructure area plan

Update of the template for the preparation of the expert report in pursuant to Section 69 para. 1 WindSeeG

Pursuant to Section 69 (1) WindSeeG (in the version dated January 1, 2023, and December 22, 2025), it is stipulated that, in order to demonstrate compliance with the minimum requirements of the standard design, an expert report must be submitted for plausibility checking no later… Read More »Update of the template for the preparation of the expert report in pursuant to Section 69 para. 1 WindSeeG

BSH announcement: Transboundary consultation of the Dutch North Sea Programme 2028-2033

  • General

The Dutch Ministry of Infrastructure and Water Management is consulting on the scoping documents of the North Sea Programme 2028-2033 in accordance with the Convention on environmental impact assessment in a transboundary context (Espoo-Convention) with the opportunity to submit comments by 11 May 2026. The… Read More »BSH announcement: Transboundary consultation of the Dutch North Sea Programme 2028-2033

BSH announces plan approval decision for the construction and operation of the offshore windfarm “NC 4”

  • General

The BSH has issued the planning approval decision for the offshore windfarm “NC 4” on 27th March 2026 based on Section 66, 70 of the Offshore Wind Energy Act. A digital copy of the planning approval decision together with the approved planning documents is available… Read More »BSH announces plan approval decision for the construction and operation of the offshore windfarm “NC 4”

BSH announces plan approval decision for the construction and operation of the offshore windfarm “NC 3”

  • General

The BSH has issued the planning approval decision for the offshore windfarm “NC 3” on 27th March 2026 based on Section 66, 70 of the Offshore Wind Energy Act. A digital copy of the planning approval decision together with the approved planning documents is available… Read More »BSH announces plan approval decision for the construction and operation of the offshore windfarm “NC 3”