Skip to content

Preliminary Investigation of Sites

Windpark

BSH announces the public display of the documents and the discussion hearing on the suitability assessment for sites N-13.1 and N-13.2

  • General

The Federal Maritime and Hydrographic Agency (BSH) announced on 21 August 2026 that the drafts of the determination of suitability, the suitability assessment and the environmental report for sites N-13.1 and N-13.2, which are to be put out to tender in calendar year 2027, will… Read More »BSH announces the public display of the documents and the discussion hearing on the suitability assessment for sites N-13.1 and N-13.2

BSH has made available for inspection the 5. WindSeeV and other documents concerning the suitability examination

  • General

On 22 January 2025, the Federal Maritime and Hydrographic Agency (BSH) determined the suitability of sites N-10.1 and N-10.2 for tendering by the Federal Network Agency (BNetzA) in accordance with Part 3 Section 5 Wind Energy Act (WindSeeG) by means of an ordinance. The Fifth… Read More »BSH has made available for inspection the 5. WindSeeV and other documents concerning the suitability examination

Publishing the results of the central preliminary investigation of sites N-10.1 and N-10.2 for the construction of offshore wind farms in the German EEZ

  • General

The Federal Maritime and Hydrographic Agency (BSH) has published the results of the central preliminary investigation for the construction of offshore wind farms in the German exclusive economic zone (EEZ). The results are available on the Data Hub Preliminary Investigation of Sites (PINTA). According to… Read More »Publishing the results of the central preliminary investigation of sites N-10.1 and N-10.2 for the construction of offshore wind farms in the German EEZ