BSH announces planning approval decision for the construction and operation of the offshore grid-connection “BorWin4/ delta”

The BSH issued the planning approval decision for the offshore grid-connection “BorWin4 and BorWin delta”on 06 March 2024 based on Section 45 of the Offshore Wind Energy Act in the version applicable until 31 December 2022 in connection with Section 74 of the Administrative Procedure… Read More »BSH announces planning approval decision for the construction and operation of the offshore grid-connection “BorWin4/ delta”

Publication of a template for the preparation of the expert opinion pursuant to § 69 (1) WindSeeG and a leaflet with instructions

The regulation in § 69 (1) WindSeeG (in the version of 01.01.2023) stipulates that in future an expert opinion must be submitted at least twelve weeks before the start of construction to prove compatibility with the minimum requirements of the Standard Design. For procedures within… Read More »Publication of a template for the preparation of the expert opinion pursuant to § 69 (1) WindSeeG and a leaflet with instructions

BSH announces planning approval decision for the construction and operation of the offshore grid-connection “DolWin4/ delta”

  • General

The BSH issued the planning approval decision for the offshore grid-connection “DolWin4 and DolWin delta”on 20.december 2023 based on Section 45 of the Offshore Wind Energy Act in the version applicable until 31 December 2022in connection with Section 74 of the Administrative Procedure Act in… Read More »BSH announces planning approval decision for the construction and operation of the offshore grid-connection “DolWin4/ delta”

BSH announces planning approval decision for the construction and operation of the offshore grid-connection “BorWin5 and BorWin epsilon”

  • General

The BSH issued the planning approval decision for the offshore grid-connection “BorWin5 and BorWin epsilon”on 19 January 2024 based on Section 45 of the Offshore Wind Energy Act in the version applicable until 31 December 2022 in connection with Section 74 of the Administrative Procedure… Read More »BSH announces planning approval decision for the construction and operation of the offshore grid-connection “BorWin5 and BorWin epsilon”

BSH announces planning approval decision for the construction and operation of the offshore grid-connection “Ostwind 3”

  • General

The BSH issued the planning approval decision for the offshore grid-connection “Ostwind 3” consisting of the grid connection OST-1-4 and the transformer platform Jasmund for the grid connection of the offshore wind farm within the site O-1.3 in the German EEZ of the Baltic Sea… Read More »BSH announces planning approval decision for the construction and operation of the offshore grid-connection “Ostwind 3”

BSH announces planning approval decision for the construction and operation of the offshore grid-connection “DolWin5 und DolWin epsilon”

The BSH issued the planning approval decision for the offshore grid connection “DolWin5 un DolWin epsilon”on 22 March 2023 based on Section 45 of the Offshore Wind Energy Act in the version of 27 July 2021 in connection with Section 74 of the Administrative Procedure… Read More »BSH announces planning approval decision for the construction and operation of the offshore grid-connection “DolWin5 und DolWin epsilon”