Skip to content

Save-the-Date: Workshop on subsequent use of sites in context of the Site Development Plan (SDP)

  • Uncategorised

The Federal Maritime and Hydrographic Agency (BSH) published the draft Site Development Plan (SDP) at July 1st 2022. In the appendix of this draft the subsequent use of sites has been adressed and put to consultation for the first time. The public has the opportunity… Read More »Save-the-Date: Workshop on subsequent use of sites in context of the Site Development Plan (SDP)

Publication of final versions of final reports as part of the procedure for the suitability assessment of sites N-6.6 and N-6.7

  • Uncategorised

The BSH supplements its documents already published on 27 May 2022 as part of the procedure for the suitability assessment of sites N-6.6 and N-6.7. The BSH now received the final reports for the protected assets benthos, fish and biotopes. The publication of these final… Read More »Publication of final versions of final reports as part of the procedure for the suitability assessment of sites N-6.6 and N-6.7

New feature “Revision filter” available in the Data Hub Preliminary Investigation of Sites – PINTA 

  • Uncategorised

On February 25, 2022, the BSH published the results of the preliminary site investigation for the construction of offshore wind farms in the German exclusive economic zone (EEZ) for the site N-7.2 planned for this year according to the Site Development Plan of the BSH… Read More »New feature “Revision filter” available in the Data Hub Preliminary Investigation of Sites – PINTA 

BSH publically notifies the public display of the draft of the suitability examination, the draft of the determination of suitability and the drafts of the environmental reports for the sites N-6.6 and N-6.7

  • Uncategorised

On 20 May 2022, the Federal Maritime and Hydrographic Agency (BSH) notified that the draft of the suitability examination, the draft of the determination of suitability and the drafts of the environmental reports for the sites N-6.6 and N-6.7, which will be put out to… Read More »BSH publically notifies the public display of the draft of the suitability examination, the draft of the determination of suitability and the drafts of the environmental reports for the sites N-6.6 and N-6.7

Updating Process Site Development Plan: Publication of an extended preliminary draft and statements of the Federal Network Agency and the Transmission System Operators

  • Uncategorised

The BSH announced the initiation of the procedure to amend and update the land development plan on 17 December 2021. In a letter dated 6 April 2022, the Federal Network Agency sent the BSH a statement on the possible implementation of the draft of a… Read More »Updating Process Site Development Plan: Publication of an extended preliminary draft and statements of the Federal Network Agency and the Transmission System Operators