Joint comment of the transmission system operators on the site development plan

After the initiation of the procedure for amending and updating the Site Development Plan was announced on 1 September 2023, the transmission system operators have now submitted their joint comment on the preliminary draft of the Site Development Plan at the request of the Federal… Read More »Joint comment of the transmission system operators on the site development plan

Revision of the site development plan: Initiation of the procedure and publication of documents

After the site development plan 2023 and the associated environmental reports have been made public on 20.01.2023, further sites are required for the expansion of offshore wind energy in order to achieve the expansion targets pursuant to Sec. 1 para. 2 WindSeeG. A new revision… Read More »Revision of the site development plan: Initiation of the procedure and publication of documents

BSH updates overviews for the minimum application and planning documents

The BSH has updated the overviews for the minimum application and planning documents to be submitted in the plan approval procedure. In particular, the different requirements for projects on centrally pre-investigated sites and non-centrally pre-investigated sites have been met by preparing separate information sheets. The… Read More »BSH updates overviews for the minimum application and planning documents

Shape-files for areas N-23, N-24 and N-25 of the annex to the accompanying expert report FEP 2023 published

The Federal Maritime and Hydrographic Agency (BSH) has made available on its website shape-files for the annex to the report “Weiterentwicklung der Rahmenbedingungen zur Planung von Windenergieanlagen auf See und Netzanbindungssysteme” (Further development of the framework conditions for planning offshore wind turbines and grid connection… Read More »Shape-files for areas N-23, N-24 and N-25 of the annex to the accompanying expert report FEP 2023 published

BSH announces planning approval decision for the construction and operation of the offshore grid-connection “DolWin5 und DolWin epsilon”

The BSH issued the planning approval decision for the offshore grid connection “DolWin5 un DolWin epsilon”on 22 March 2023 based on Section 45 of the Offshore Wind Energy Act in the version of 27 July 2021 in connection with Section 74 of the Administrative Procedure… Read More »BSH announces planning approval decision for the construction and operation of the offshore grid-connection “DolWin5 und DolWin epsilon”