On February 25, 2022, the BSH published the results of the preliminary site investigation for the construction of offshore wind farms in the German exclusive economic zone (EEZ) for the site N-7.2 planned for this year according to the Site Development Plan of the BSH (FEP) via the Data Hub Preliminary Investigation of Sites (PINTA). The sites N-3.5 and N-3.6, which are expected to be put out to tender by the BNetzA in 2023 according to the specifications of the FEP, have also been published.
With the current update of the data hub PINTA it will be possible to use another filter option. Revision information can be displayed in this way. In addition, the revisions will be highlighted separately.
The adjustments in the revision supplement the investigation results and documents of the preliminary site investigation published with the announcement of the invitation to tender for the fulfillment of the legal obligation from Sec. 19 para. 2 no. 7 Offshore Wind Energy Act (WindSeeG). These are findings that have arisen in the meantime in the course of the evaluation of the collected raw data for other purposes. The publication of the revision is on a voluntary basis, the investigation results and documents published with the announcement of the tender remain unaffected.
Now the following revisions are available on the data hub PINTA:
Site N-7.2: Geotechnical Data Report Revision1
The revision to the gDF for FEP site N-7.2 includes adjustments to specifications of laboratory tests (CID,CAUc,CAUe) and adjustments in the presentation of laboratory test results (CAUe, CAUc, DSS). The adjustments contained in this report revision can be found in the revision list of the report.
As well as for the sites:
Site N-3.7: Geotechnical Data Report Revision1
Site N-3.8: Geological Report Revision 1
Site N-3.8: ArcGIS Project Revision 1
Site N-3.8: Kingdom Project Revision 1